Here is the building it originally had 2 bay doors and the stairs to the second story were inside. We built an external staircase to the second story and eliminated the internal stairs to create space, as well as got rid of the garage doors.




Already have water coming out to the building via a frost free. Took that out and ran the water throughout the building.




Insulated - drywalled and installed new doors. The back wall will be tiled. That is where the brewstand will be against.

Here is a shot of the building from the outside after I painted the building.




These are pretty current pics here. The tile is in and needs wiped down still. Painted walls obviously. The hood is actually installed but I don't have a pic of that yet. Wood for bar and trim is off at finishers.