
basically the new rig stemmed from the need of more buttons, more stainless, and more beer! I think I enjoy building as much as brewing so I started on my new rig. Basic rundown- 3-29gal stainless pool filters (single tier), 2-300,000 BTU burners and 1-200,000 BTU burner, 2 March pumps, plate chiller, 3 asco solenoid valves for the gas control, microcontroller with 2.5" lcd screen to display temps and controls. I will try and get some pics up in a couple days or so. I can't wait to brew!
jyoung wrote:basically the new rig stemmed from the need of more buttons, more stainless, and more beer! I think I enjoy building as much as brewing so I started on my new rig. Basic rundown- 3-29gal stainless pool filters (single tier), 2-300,000 BTU burners and 1-200,000 BTU burner, 2 March pumps, plate chiller, 3 asco solenoid valves for the gas control, microcontroller with 2.5" lcd screen to display temps and controls. I will try and get some pics up in a couple days or so. I can't wait to brew!

jyoung wrote:basically the new rig stemmed from the need of more buttons, more stainless, and more beer! I think I enjoy building as much as brewing so I started on my new rig. Basic rundown- 3-29gal stainless pool filters (single tier), 2-300,000 BTU burners and 1-200,000 BTU burner, 2 March pumps, plate chiller, 3 asco solenoid valves for the gas control, microcontroller with 2.5" lcd screen to display temps and controls.
jyoung wrote:I will try and get some pics up in a couple days or so. I can't wait to brew!
Corporal – SoCal Division, Inland Empire Platoon
Users browsing this forum: No registered users